GSIC Center, Tokyo Institute of Technology


The following table shows previous lists and the number of systems installed when the list was published. Site Efficiency in the table is SUM(Rmax)/SUM(Rpeak), expressed as a percentage.

List Systems Highest Ranking Sum Rmax
(GFlops)
Sum Rpeak
(GFlops)
Site Efficiency
(%)
06/2008 1 24 67700.00 109728.00 61.70
11/2007 1 16 56430.00 102021.00 55.31
06/2007 1 14 48880.00 78796.80 62.03
11/2006 1 9 47380.00 82124.80 57.69
06/2006 1 7 38180.00 49868.80 76.56
06/2004 1 334 788.80 1555.20 50.72
11/2003 1 175 788.80 1555.20 50.72
06/2003 1 86 788.80 1555.20 50.72
11/2002 2 68 972.90 1945.60 50.01
06/2002 2 47 868.30 1740.80 49.88
11/2001 3 86 578.50 896.00 64.56
06/2001 3 195 324.20 489.60 66.22
11/2000 2 158 224.40 281.60 79.69
06/2000 2 100 224.40 281.60 79.69
11/1997 1 475 10.27 11.43 89.86
06/1997 1 341 10.27 11.43 89.86
11/1996 1 189 10.27 11.43 89.86
06/1996 1 147 10.27 11.43 89.86
11/1995 1 115 10.27 11.43 89.86