The following table shows previous lists and the number of systems installed when the list was published. Site Efficiency in the table is SUM(Rmax)/SUM(Rpeak), expressed as a percentage.

List Systems Highest Ranking Sum Rmax
(GFlops)
Sum Rpeak
(GFlops)
Site Efficiency
(%)
06/2008 2 14 100723.00 126156.80 79.84
11/2007 2 8 100723.00 126156.80 79.84
06/2007 2 4 100723.00 126156.80 79.84
11/2006 2 3 100723.00 126156.80 79.84
06/2006 2 2 100650.00 126156.80 79.78
11/2005 2 2 100650.00 126156.80 79.78
06/2005 2 2 100650.00 126156.80 79.78
11/2004 1 15 8655.00 11469.00 75.46
06/2004 1 8 8655.00 11469.00 75.46
11/2003 2 73 2005.00 2828.00 70.90
06/2003 1 144 570.00 780.00 73.08
11/2002 1 101 554.00 780.00 71.03
06/2002 1 70 554.00 780.00 71.03
11/2001 3 78 628.40 922.00 68.16
06/2001 3 103 491.40 730.00 67.32
11/2000 2 146 257.40 382.00 67.38
06/2000 2 96 222.90 382.00 58.35
11/1999 2 108 179.30 314.90 56.94
11/1995 2 182 10.60 24.51 43.24
06/1995 2 144 10.60 24.51 43.24
11/1994 1 57 12.10 34.05 35.54