T3E

Site: NRI for Earth Science and Disaster (NIED)
Manufacturer: Cray/HPE
Cores: 172
Processor: EV5 300MHz
Interconnect: 3-D Torus
Installation Year: 1997
Performance
Linpack Performance (Rmax) 74.50 GFlop/s
Theoretical Peak (Rpeak) 103.20 GFlop/s
Software
Operating System: UNICOS
List Rank System Vendor Total Cores Rmax (GFlop/s) Rpeak (GFlop/s) Power (kW)
06/2001 460 T3E Cray/HPE 172 74.50 103.20
11/2000 341 T3E Cray/HPE 172 74.50 103.20
06/2000 175 T3E Cray/HPE 172 74.50 103.20
11/1999 135 T3E Cray/HPE 172 74.50 103.20
06/1999 89 T3E Cray/HPE 172 74.50 103.20
11/1998 70 T3E Cray/HPE 172 74.50 103.20