BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet, Windows OS

Site: Mitsubishi UFJ Securities
Manufacturer: IBM
Cores: 1,760
Processor: Xeon 5160 2C 3GHz
Interconnect: Gigabit Ethernet
Installation Year: 2007
Performance
Linpack Performance (Rmax) 6.52 TFlop/s
Theoretical Peak (Rpeak) 21.12 TFlop/s
Nmax 404,800
Power Consumption
Power: 167.00 kW
Software
Operating System: Linux
List Rank System Vendor Total Cores Rmax (GFlop/s) Rpeak (GFlop/s) Power (kW)
11/2007 424 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet, Windows OS IBM 1,760 6.52 21.12 167.00
06/2007 194 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet, Windows OS IBM 1,760 6.52 21.12 167.00