BladeCenter HS21 Cluster, Xeon dual core 2.66 GHz, GigEthernet

Site: Geoscience (H)
Manufacturer: IBM
Cores: 1,008
Processor: Xeon 5150 2C 2.67GHz
Interconnect: Gigabit Ethernet
Installation Year: 2007
Performance
Linpack Performance (Rmax) 4.97 TFlop/s
Theoretical Peak (Rpeak) 10.75 TFlop/s
Power Consumption
Power: 94.00 kW
Software
Operating System: Linux
List Rank System Vendor Total Cores Rmax (GFlop/s) Rpeak (GFlop/s) Power (kW)
06/2007 334 BladeCenter HS21 Cluster, Xeon dual core 2.66 GHz, GigEthernet IBM 1,008 4.97 10.75 94.00