Site: | Logistic Services (D) |
---|---|
Manufacturer: | HPE |
Cores: | 1,336 |
Processor: | Xeon 5160 2C 3GHz |
Interconnect: | Gigabit Ethernet |
Installation Year: | 2007 |
Performance | |
Linpack Performance (Rmax) | 9.54 TFlop/s |
Theoretical Peak (Rpeak) | 16.03 TFlop/s |
Software | |
Operating System: | Linux |
List | Rank | System | Vendor | Total Cores | Rmax (GFlop/s) | Rpeak (GFlop/s) | Power (kW) |
---|---|---|---|---|---|---|---|
06/2007 | 85 | Cluster Platform 3000 BL460c, Xeon 51xx 3.0GHz, GigEthernet | HPE | 1,336 | 10.42 | 16.03 | |
06/2008 | 411 | Cluster Platform 3000 BL460c, Xeon 51xx 3.0GHz, GigEthernet | HPE | 1,336 | 9.54 | 16.03 | |
11/2007 | 170 | Cluster Platform 3000 BL460c, Xeon 51xx 3.0GHz, GigEthernet | HPE | 1,336 | 9.54 | 16.03 |