BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet

Site: Geoscience (P)
Manufacturer: IBM
Cores: 1,240
Processor: Xeon 5160 2C 3GHz
Interconnect: Gigabit Ethernet
Installation Year: 2007
Performance
Linpack Performance (Rmax) 6.12 TFlop/s
Theoretical Peak (Rpeak) 14.88 TFlop/s
Power Consumption
Power: 118.00 kW
Software
Operating System: Linux
List Rank System Vendor Total Cores Rmax (GFlop/s) Rpeak (GFlop/s) Power (kW)
11/2007 469 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet IBM 1,240 6.12 14.88 118.00
06/2007 226 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet IBM 1,240 6.12 14.88 118.00