BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet

Site: Geoscience (P)
Manufacturer: IBM
Cores: 2,764
Processor: Xeon 5160 2C 3GHz
Interconnect: Gigabit Ethernet
Installation Year: 2008
Performance
Linpack Performance (Rmax) 13.64 TFlop/s
Theoretical Peak (Rpeak) 33.17 TFlop/s
Power Consumption
Power: 263.00 kW (Submitted)
Software
Operating System: Linux
List Rank System Vendor Total Cores Rmax (GFlop/s) Rpeak (GFlop/s) Power (kW)
11/2008 454 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet IBM 2,764 13.64 33.17 263.00
06/2008 232 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet IBM 2,764 13.64 33.17 263.00